
S&K Mission Management worked with qualified vendors for the design and construction of a new stick game facility at the Standing Arrow Powwow Grounds in Elmo, Montana on the Flathead Reservation.
The stick game complex is a large circle shaped pavilion with an open sided design. The project was completed during the spring of 2024, in time for the Standing Arrow Powwow in July.
Tasks included:
- Site cleanup
- Removal of existing aged structure
- Excavation and installation of footings
- Concrete base and drains
- Log and asphalt columns
- Framing and setting of trusses, shed work, and roof sheeting/shingling
- Electrical work
- Carpeting and miscellaneous finishes


